This project was done for the Preble County Engineer. It involved widening 3.5 miles of roadway on both sides. The roadway was then overlaid with 3inches of asphalt. The side ditches were reshaped the entire length of the job. New signs, guard rail and striping were also installed. This project was started in September 2017 and completed in November 2017.

 

7,900 CY of Excavation

6,721 CY of Embankment

4,200 CY of Type C Granular aggregate base

4,500 Ton of 304 aggregate base

7 Miles of Ditch regraded and seeded