Union Village

Union Village- Milcon was awarded the Union Village project in the spring of 2018. This project entails doing the mass excavation and embankment, installing new streets including curbs, asphalt and walks, installing the sanitary sewer approx. 13,500 LF, storm sewer approx. 11,000 LF and water main … [Read more...]

Greene County ODOT Full Service Maintenance Facility

In Spring 2018, Milcon was awarded Greene County ODOT Full Service Maintenance Facility contract.  Milcon cleared the site of topsoil, trees and provided erosion control. Excavation and embankment for storm runoff and detention, building pads and parking lot is completed. Milcon installed the main … [Read more...]

WPAFB Steam Tunnel

In July 2018, Milcon begun the Steam Line Replacement project at Wright Patterson Air Force Base. This project consists of 10,500.00 SF of Tunnel Footer Slab, 2,074.00 LF of Tunnel Walls along with the Tunnel Cap. There is an estimated 1,500.00 CU. YDS. of concrete to be placed. … [Read more...]

Brandt-Phoneton Waterline

Milcon was awarded this project by Miami County in the fall of 2016. The project was completed in the spring of 2017. This project installed a new water main and water services to the residents of the Brandt and Phoneton areas in Miami County. The ditches were regraded along the entire length of the … [Read more...]

FedEx Ground South Dayton Facility

FedEx Ground South Dayton Facility is a job that Milcon Commercial Concrete is currently working on. It is a 32-acre complex with 250,000sf under the roof. There were over 2,400lf of footer + 84 column pads on the main building. 1/3 of the footers had to be” hammered out” through rock. Inside the … [Read more...]

PSA Hangar Addition

This is a project that our road construction division and our concrete division worked on together. Milcon started work on the PSA Hangar Addition Early Site Work Package in August and will finish in December. This project included building an 80,000 SF building pad, 11,000 CY of compacted fill, … [Read more...]

Miami University

Milcon Concrete started the Miami University project in May of 2014. The project will be complete in July of 2015. Milcon Concrete was responsible for demo of existing walks and hardscapes around six buildings on the twenty-five acre site. All of the buildings were excavated around down to the … [Read more...]

Vanguard Blvd.

In March 2012 Milcon Concrete was selected, through public bid, to extend Vanguard Boulevard road in Miamisburg, Ohio for the Mound Development.  This $4.1 million project started with the Milcon management team looking at what was going to be needed to fulfill this commitment.  After selecting … [Read more...]