Stillwater Crossing in West Milton

In November 2019, Milcon Concrete broke ground on Stillwater Crossing. Located on an 89 acre lot in West Milton, OH, when completed, Stillwater Crossing will include housing, retirement cottages, a nursing facility and an outpatient  care center. The project began with the crews clearing the land of … [Read more...]

Henny Penny

[Read more...]

College Drive

The College Drive Extension is roughly 1,900 feet road extension located in the City of Kettering.  As part of this roadway extension project, Milcon Concrete Inc. was also tasked with installing storm sewer spanning the project with the accompanying manholes and catch basins.  The roadway has … [Read more...]

Community Tissue Kettering, OH

April 2019, Milcon Commercial Concrete's first pour at Community Tissue Services in Kettering Ohio. Roughly 11,000 SF and 170 Cu. Yds. Ernst Concrete provided the pump and the concrete. We were also able to utilize our new 940 Somero Laser Screed.         … [Read more...]

Union Village – Phase One

  The Union Village Phase One project will be completed by Milcon Concrete Inc. on an approximately 40-acre site located in Warren County, OH. This project includes plans for 125 separate lots complete with aesthetic features, connecting asphalt streets, concrete sidewalks and asphalt … [Read more...]

Ohio Northern University Engineering Building

The Ohio Northern University’s new Engineering Building.  Milcon has poured roughly 43,500 ft2 of slab on deck with about 27,000 ft2 left to pour. This building will utilize an estimated 2,500 yd3 of concrete. … [Read more...]

Versailles North West Street Extension

Milcon was awarded the Versailles North West Street Extension in the Spring of 2018. The project entailed extending North West Street 1,860’from Jackson Street to Baker Road including new storm sewer, sanitary sewer and water main, curbs, side walk and asphalt paving. The sanitary sewer, storm sewer … [Read more...]

WPAFB Steam Tunnel

In July 2018, Milcon begun the Steam Line Replacement project at Wright Patterson Air Force Base. This project consists of 10,500.00 SF of Tunnel Footer Slab, 2,074.00 LF of Tunnel Walls along with the Tunnel Cap. There is an estimated 1,500.00 CU. YDS. of concrete to be placed. … [Read more...]

Piqua Shawnee Storm Sewer Improvements

Milcon was awarded this project in the fall of 2017 by the City of Piqua. The project consisted of installing a 7’x2’box culvert from the river in Piqua to the MCD levee, setting a flap valve manhole assembly structure then running 48”concrete storm sewer through the levee. A manual gate valve … [Read more...]

Brandt-Phoneton Waterline

Milcon was awarded this project by Miami County in the fall of 2016. The project was completed in the spring of 2017. This project installed a new water main and water services to the residents of the Brandt and Phoneton areas in Miami County. The ditches were regraded along the entire length of the … [Read more...]