Greene County ODOT Full Service Maintenance Facility

          In Spring 2018, Milcon was awarded Greene County ODOT Full Service Maintenance Facility contract.  Milcon cleared the site of topsoil, trees and provided erosion control. Excavation and embankment for storm runoff and detention, building pads and … [Read more...]

WPAFB Steam Tunnel

In July 2018, Milcon begun the Steam Line Replacement project at Wright Patterson Air Force Base. This project consists of 10,500.00 SF of Tunnel Footer Slab, 2,074.00 LF of Tunnel Walls along with the Tunnel Cap. There is an estimated 1,500.00 CU. YDS. of concrete to be placed. … [Read more...]

Home 2 Centerville

Milcon recently wrapped up our Home 2 Centerville project that began August 2017. This project was a 15,000.00 SF (on grade) Hotel located in Centerville, Ohio. One of the interesting aspects of this project was the colored and stamped concrete at the main and pool entrances which showcases Milcon’s … [Read more...]

Fairhaven Shelby County Home

  In March 2018, Milcon was awarded the Fairhaven Shelby County Home project and began footer excavation and slab prep. Currently Milcon is working on courtyard and site concrete to complete the project. … [Read more...]

Lexington-Salem Rd

This project was done for the Preble County Engineer. It involved widening 3.5 miles of roadway on both sides. The roadway was then overlaid with 3inches of asphalt. The side ditches were reshaped the entire length of the job. New signs, guard rail and striping were also installed. This project was … [Read more...]

Warren County/Springboro 73 & 741

Milcon was awarded this project in the summer of 2017. This project consisted of reconstructing all four sides of the state route 73 and state route 741 intersection. This included new traffic signal, lighting, storm sewer and water main work. Due to the amount of traffic the new utilities all had … [Read more...]

Piqua Shawnee Storm Sewer Improvements

Milcon was awarded this project in the fall of 2017 by the City of Piqua. The project consisted of installing a 7’x2’box culvert from the river in Piqua to the MCD levee, setting a flap valve manhole assembly structure then running 48”concrete storm sewer through the levee. A manual gate valve … [Read more...]

Brandt-Phoneton Waterline

Milcon was awarded this project by Miami County in the fall of 2016. The project was completed in the spring of 2017. This project installed a new water main and water services to the residents of the Brandt and Phoneton areas in Miami County. The ditches were regraded along the entire length of the … [Read more...]

Dayton International Airport Economy Parking Lot

This project consisted of reconstruction of the entire 22 acre Economy Lot including new lighting system, security camera system, new storm sewer, curbs, walks and lanscape. There were lighting and pavement upgrades in 6 other lots at the airport. The project was challenging in many ways 1- … [Read more...]

Planet Fitness in Fairfield

Milcon Commercial Concrete was awarded the contract for the Planet Fitness project in Fairfield, Ohio. Milcon excavated and placed footers, poured concrete walls and prepped and poured the 20,000 SF slab on grade and prepped and poured the 10,000 SF slab on deck. The picture shows one of the three … [Read more...]