Undisclosed Project at WPAFB

In April of 2021, Milcon Commercial Concrete broke ground on a 5-story building at Wright Patterson Air Force Base. Prior to our work commencing, auger cast piles were driven in the ground to help stabilize the foundation of the structure. The footings varied in size with the majority being 14 foot … [Read more...]

Maple Ave – Fairborn, OH

Milcon began work on the Maple Avenue Phase 2 Project for the City of Fairborn, OH in the Summer of 2021 and completed it in the Summer of 2022. This project consisted of installing new infrastructure utilities, along with reconstructing sections of a major thoroughfare in Fairborn. Over the course … [Read more...]

Lau Industries – Englewood, OH

In November of 2022, Milcon Commercial Concrete began footings on a 250,000 square foot warehouse in Englewood, OH. Milcon had to endure some wet conditions at the start of this project but endured and completed the footings and moved onto the slabs. We completed the slabs in 8 pours including the 2 … [Read more...]

Central Avenue – Middletown, OH

In March of 2022, Milcon started working at Central Avenue. Located in the heart of downtown Middletown, OH and measuring around ¾ of a mile long, this project consists of water main replacement, storm sewer replacement, and sanitary sewer underground pipelining. On the surface, all pavement, … [Read more...]

Wannemacher – Lima, OH

In June of 2022, Milcon Commercial Concrete began foundations on a 370,000 square foot warehouse in Lima, OH. This was a unique project because of the heavy nature of the foundations, most of the footings 6 foot wide and 16 inches thick. The foundation walls varied in heights from 7 foot tall to 17 … [Read more...]

Corwin Avenue – Hamilton, OH

In May of 2021, Milcon was awarded the Corwin Avenue project for the City of Hamilton. This project was a full-depth reconstruction of approximately 2,500 LF of roadway, along with an additional 4,000 LF of curb replacement, walk replacement and asphalt milling and overlay. Our crews replaced 2,500’ … [Read more...]

Stillwater Crossing in West Milton

In November 2019, Milcon Concrete broke ground on Stillwater Crossing. Located on an 89 acre lot in West Milton, OH, when completed, Stillwater Crossing will include housing, retirement cottages, a nursing facility and an outpatient  care center. The project began with the crews clearing the land of … [Read more...]

Henny Penny

In 2020, Milcon Commercial Concrete expanded the Henny Penny Facility located in Eaton, OH by 125,ooo square feet. … [Read more...]

College Drive

The College Drive Extension is roughly 1,900 feet road extension located in the City of Kettering.  As part of this roadway extension project, Milcon Concrete Inc. was also tasked with installing storm sewer spanning the project with the accompanying manholes and catch basins.  The roadway has … [Read more...]

Community Tissue Kettering, OH

April 2019, Milcon Commercial Concrete's first pour at Community Tissue Services in Kettering Ohio. Roughly 11,000 SF and 170 Cu. Yds. Ernst Concrete provided the pump and the concrete. We were also able to utilize our new 940 Somero Laser Screed.         … [Read more...]