WPAFB Inspection Gate 26A

Check out these pictures from our recently completed footer slab for the new inspection gate pit at WPAFB! Once the walls are poured and back filled footers for the building will begin. … [Read more...]

Union Village – Phase One

  The Union Village Phase One project will be completed by Milcon Concrete Inc. on an approximately 40-acre site located in Warren County, OH. This project includes plans for 125 separate lots complete with aesthetic features, connecting asphalt streets, concrete sidewalks and asphalt … [Read more...]

Ohio Northern University Engineering Building

The Ohio Northern University’s new Engineering Building.  Milcon has poured roughly 43,500 ft2 of slab on deck with about 27,000 ft2 left to pour. This building will utilize an estimated 2,500 yd3 of concrete. … [Read more...]

Union Village

Union Village- Milcon was awarded the Union Village project in the spring of 2018. This project entails doing the mass excavation and embankment, installing new streets including curbs, asphalt and walks, installing the sanitary sewer approx. 13,500 LF, storm sewer approx. 11,000 LF and water main … [Read more...]

Springfield Street in Dayton, OH

Springfield Street was awarded in the Summer 2018 by the City of Dayton. The project involves total removal and replacement of 3,200 feet of roadway including the existing curbs, sidewalks, storm sewer, street lighting and traffic signals. The work is being performed in two phases. Phase 1, the … [Read more...]

Versailles North West Street Extension

Milcon was awarded the Versailles North West Street Extension in the Spring of 2018. The project entailed extending North West Street 1,860’from Jackson Street to Baker Road including new storm sewer, sanitary sewer and water main, curbs, side walk and asphalt paving. The sanitary sewer, storm sewer … [Read more...]

Greene County ODOT Full Service Maintenance Facility

In Spring 2018, Milcon was awarded Greene County ODOT Full Service Maintenance Facility contract.  Milcon cleared the site of topsoil, trees and provided erosion control. Excavation and embankment for storm runoff and detention, building pads and parking lot is completed. Milcon installed the main … [Read more...]

WPAFB Steam Tunnel

In July 2018, Milcon begun the Steam Line Replacement project at Wright Patterson Air Force Base. This project consists of 10,500.00 SF of Tunnel Footer Slab, 2,074.00 LF of Tunnel Walls along with the Tunnel Cap. There is an estimated 1,500.00 CU. YDS. of concrete to be placed. … [Read more...]

Home 2 Centerville

Milcon recently wrapped up our Home 2 Centerville project that began August 2017. This project was a 15,000.00 SF (on grade) Hotel located in Centerville, Ohio. One of the interesting aspects of this project was the colored and stamped concrete at the main and pool entrances which showcases Milcon’s … [Read more...]

Fairhaven Shelby County Home

  In March 2018, Milcon was awarded the Fairhaven Shelby County Home project and began footer excavation and slab prep. Currently Milcon is working on courtyard and site concrete to complete the project. … [Read more...]