The College Drive Extension is roughly 1,900 feet road extension located in the City of Kettering.  As part of this roadway extension project, Milcon Concrete Inc. was also tasked with installing storm sewer spanning the project with the accompanying manholes and catch basins.  The roadway has … [Read more...]

Community Tissue Kettering, OH

April 2019, Milcon Commercial Concrete's first pour at Community Tissue Services in Kettering Ohio. Roughly 11,000 SF and 170 Cu. Yds. Ernst Concrete provided the pump and the concrete. We were also able to utilize our new 940 Somero Laser Screed.         … [Read more...]

Now Hiring Concrete Finisher/Laborer

Milcon Commercial Concrete is seeking entry level and experienced concrete laborers and finishers! Applicants must be able to lift and carry at least 50lbs. Good attendance and punctuality are a must. Interested applicants can apply online by going to www.milcon-inc.com, giving our office a call at … [Read more...]

WPAFB Inspection Gate 26A

Check out these pictures from our recently completed footer slab for the new inspection gate pit at WPAFB! Once the walls are poured and back filled footers for the building will begin. … [Read more...]

Ohio Northern University Engineering Building

The Ohio Northern University’s new Engineering Building.  Milcon has poured roughly 43,500 ft2 of slab on deck with about 27,000 ft2 left to pour. This building will utilize an estimated 2,500 yd3 of concrete. … [Read more...]

Union Village

Union Village- Milcon was awarded the Union Village project in the spring of 2018. This project entails doing the mass excavation and embankment, installing new streets including curbs, asphalt and walks, installing the sanitary sewer approx. 13,500 LF, storm sewer approx. 11,000 LF and water main … [Read more...]

Springfield Street in Dayton, OH

Springfield Street was awarded in the Summer 2018 by the City of Dayton. The project involves total removal and replacement of 3,200 feet of roadway including the existing curbs, sidewalks, storm sewer, street lighting and traffic signals. The work is being performed in two phases. Phase 1, the … [Read more...]

Versailles North West Street Extension

Milcon was awarded the Versailles North West Street Extension in the Spring of 2018. The project entailed extending North West Street 1,860’from Jackson Street to Baker Road including new storm sewer, sanitary sewer and water main, curbs, side walk and asphalt paving. The sanitary sewer, storm sewer … [Read more...]

Home 2 Centerville

Milcon recently wrapped up our Home 2 Centerville project that began August 2017. This project was a 15,000.00 SF (on grade) Hotel located in Centerville, Ohio. One of the interesting aspects of this project was the colored and stamped concrete at the main and pool entrances which showcases Milcon’s … [Read more...]