Wannemacher
Stillwater Crossing in West Milton
In November 2019, Milcon Concrete broke ground on Stillwater Crossing. Located on an 89 acre lot in West Milton, OH, when completed, Stillwater Crossing will include housing, retirement cottages, a nursing facility and an outpatient care center. The project began with the crews clearing the land of … [Read more...]
College Drive
The College Drive Extension is roughly 1,900 feet road extension located in the City of Kettering. As part of this roadway extension project, Milcon Concrete Inc. was also tasked with installing storm sewer spanning the project with the accompanying manholes and catch basins. The roadway has … [Read more...]
Community Tissue Kettering, OH
April 2019, Milcon Commercial Concrete's first pour at Community Tissue Services in Kettering Ohio. Roughly 11,000 SF and 170 Cu. Yds. Ernst Concrete provided the pump and the concrete. We were also able to utilize our new 940 Somero Laser Screed. … [Read more...]
WPAFB Inspection Gate 26A
Check out these pictures from our recently completed footer slab for the new inspection gate pit at WPAFB! Once the walls are poured and back filled footers for the building will begin. … [Read more...]
Ohio Northern University Engineering Building
The Ohio Northern University’s new Engineering Building. Milcon has poured roughly 43,500 ft2 of slab on deck with about 27,000 ft2 left to pour. This building will utilize an estimated 2,500 yd3 of concrete. … [Read more...]
Union Village
Union Village- Milcon was awarded the Union Village project in the spring of 2018. This project entails doing the mass excavation and embankment, installing new streets including curbs, asphalt and walks, installing the sanitary sewer approx. 13,500 LF, storm sewer approx. 11,000 LF and water main … [Read more...]
Springfield Street in Dayton, OH
Springfield Street was awarded in the Summer 2018 by the City of Dayton. The project involves total removal and replacement of 3,200 feet of roadway including the existing curbs, sidewalks, storm sewer, street lighting and traffic signals. The work is being performed in two phases. Phase 1, the … [Read more...]