Milcon Commercial Concrete is seeking entry level and experienced concrete laborers and finishers! Applicants must be able to lift and carry at least 50lbs. Good attendance and punctuality are a must. Interested applicants can apply online by going to www.milcon-inc.com, giving our office a … [Read more...]
Union Village – Phase One
The Union Village Phase One project will be completed by Milcon Concrete Inc. on an approximately 40-acre site located in Warren County, OH. This project includes plans for 125 separate lots complete with aesthetic features, connecting asphalt streets, concrete sidewalks and asphalt … [Read more...]
Greene County ODOT Full Service Maintenance Facility
In Spring 2018, Milcon was awarded Greene County ODOT Full Service Maintenance Facility contract. Milcon cleared the site of topsoil, trees and provided erosion control. Excavation and embankment for storm runoff and detention, building pads and parking lot is completed. Milcon installed the main … [Read more...]
WPAFB Steam Tunnel
In July 2018, Milcon begun the Steam Line Replacement project at Wright Patterson Air Force Base. This project consists of 10,500.00 SF of Tunnel Footer Slab, 2,074.00 LF of Tunnel Walls along with the Tunnel Cap. There is an estimated 1,500.00 CU. YDS. of concrete to be placed. … [Read more...]
Fairhaven Shelby County Home
In March 2018, Milcon was awarded the Fairhaven Shelby County Home project and began footer excavation and slab prep. Currently Milcon is working on courtyard and site concrete to complete the project. … [Read more...]
Compliments are rare!!
Milcon Concrete received an awesome review from the City of Springboro regarding the work completed on Warren County/Springboro 73 & 741. Chris Pozzuto says: I just wanted to drop you a note to say how impressed I am with the milling and paving that occurred over the past few days. Well … [Read more...]
Lexington-Salem Rd
This project was done for the Preble County Engineer. It involved widening 3.5 miles of roadway on both sides. The roadway was then overlaid with 3inches of asphalt. The side ditches were reshaped the entire length of the job. New signs, guard rail and striping were also installed. This project was … [Read more...]
Warren County/Springboro 73 & 741
Milcon was awarded this project in the summer of 2017. This project consisted of reconstructing all four sides of the state route 73 and state route 741 intersection. This included new traffic signal, lighting, storm sewer and water main work. Due to the amount of traffic the new utilities all had … [Read more...]
Piqua Shawnee Storm Sewer Improvements
Milcon was awarded this project in the fall of 2017 by the City of Piqua. The project consisted of installing a 7’x2’box culvert from the river in Piqua to the MCD levee, setting a flap valve manhole assembly structure then running 48”concrete storm sewer through the levee. A manual gate valve … [Read more...]
Brandt-Phoneton Waterline
Milcon was awarded this project by Miami County in the fall of 2016. The project was completed in the spring of 2017. This project installed a new water main and water services to the residents of the Brandt and Phoneton areas in Miami County. The ditches were regraded along the entire length of the … [Read more...]